Skip to content

Rooftop solar · across India

Your roof can pay your electricity bill.

A free site survey, a clear quotation with the PM Surya Ghar subsidy, then installation, net meter and subsidy paperwork, by a trusted Orina Grid partner in your district.

Up to ₹78,000
PM Surya Ghar subsidy for a home
~120 units
a month from every kW on your roof
One partner
in your district, from survey to subsidy
  • PM Surya Ghar subsidy up to ₹78,000
  • Made-in-India DCR panels
  • A partner in your district
  • Net meter and subsidy paperwork done for you
  • A quotation with GST, clear to the rupee
  • Free site survey

What you save

Move or type the bill. See the system, the subsidy and what you pay.

Worked out the way an Orina Grid partner quotes: 120 units a month from each kW, about ₹7 a unit, and the PM Surya Ghar subsidy for homes. Your partner's survey gives the final price.

₹500₹12,000
System size
3 kW
It makes
360 units a month
Price incl. GST
₹1.5–1.8 L
PM Surya Ghar subsidy
− ₹78,000

You pay, after the subsidy

₹0.72–1.02 L

Saved every month

₹2,500

Pays for itself in

about 3.4 years

Over 25 years that is about ₹6.48 L more than the system costs.

Get the exact quote, free

How it works

From your first call to the subsidy in your bank.

The whole process
  1. 01Day 0

    Tell us your PIN and bill

    Two minutes, here or on WhatsApp. Your PIN code tells us which Orina Grid partner serves your district.

    You get: A call from your district’s partner

  2. 02Usually day 1–3

    Free site survey

    The partner visits: the roof’s shade, strength and direction, and your electricity connection.

    You get: The right size for your roof and bill

  3. 03Usually day 2–4

    A quotation you can read

    System, brands, GST and the PM Surya Ghar subsidy, line by line, as a PDF you can keep.

    You get: One price, with what you pay after the subsidy

  4. 04Usually week 1–3

    Installation and testing

    Structure, panels, inverter, wiring and earthing, by the partner’s own team, usually in a day or two.

    You get: A working system, tested and switched on

  5. 05Usually week 3–8

    Net meter and subsidy

    The partner files with your electricity company and on the national portal. The subsidy goes to your bank.

    You get: A net meter, and the subsidy in your account

No surprises

A quotation you can actually read.

  • Every rupee shown

    Material and work as separate lines, with HSN and SAC codes and the GST on each.

  • The subsidy, worked out

    What PM Surya Ghar credits to your bank, and what you pay after it.

  • Yours to keep

    A PDF on WhatsApp, valid for 21 days, with the brands and the terms.

Your district partner

Orina Grid partner

QUOTATION

QT-0001

Quotation for

A home in Nashik

System

3 kWp, home, tin shed

#ItemAmount
1

Solar system material

Panels, inverter and structure, with cables, protection and earthing

1,01,982
2

Installation, testing and start-up

Fitting, wiring, testing, net meter and subsidy paperwork

49,118
Total incl. GST₹1,51,100
PM Surya Ghar subsidy, to your bank− ₹78,000
You pay, after the subsidy₹73,100

For solar installers

Run your solar business on Orina Grid.

A small solar business office reviewing leads on a laptop
  1. 01 · A home asks

    Kiran Pawar, PIN 422001, bill ₹4,000

  2. 02 · Grid reads the PIN

    Nashik district, Maharashtra

  3. 03 · To the district’s partner

    Deshmukh Solar, Nashik

  4. 04 · To the right salesperson

    Amit: the fewest open leads

  • Leads by PIN code

    Orina campaigns and Orina Care referrals for your district come to you, and only you.

  • Quotations in minutes

    GST split, the subsidy worked out, a PDF with your logo.

  • Your whole team

    Owner, sales, site and accounts, each with their own view.

FAQ

Questions homes ask

How much does rooftop solar cost?

For a home, usually ₹50,000 to ₹60,000 a kW including GST, before the subsidy. The roof, the brands and the distance change it; your partner's quotation gives the exact price after the survey.

How much is the PM Surya Ghar subsidy?

For a home: ₹30,000 a kW for the first 2 kW and ₹18,000 for the third, so up to ₹78,000. It is credited to your bank account after the system is installed and inspected. Housing societies get ₹18,000 a kW for common areas.

Is my roof right for solar?

Most flat RCC roofs and tin sheds are. You need a shade-free area of about 100 square feet for each kW, facing the sun for most of the day. The free survey checks this before any price.

What happens in a power cut?

A grid-connected system switches itself off when the grid goes down, so no power flows to lines being repaired. If you want power during cuts, ask your partner about a battery.

How long does it take?

The survey within a few days, installation usually in the first three weeks, and the net meter and subsidy over the following weeks, depending on your electricity company.

Does it need much care?

Wash the dust off the panels every few weeks and keep the area around them clear. Your partner is in your district for service when you need it.

Can I pay in instalments?

Your partner can help you apply for a solar loan with a bank. The rate and approval are the bank’s.

Free site survey

Start with a visit, not a sales pitch.

  1. 01

    The Orina Grid partner for your PIN calls you, usually within a working day.

  2. 02

    They visit, check the roof and the connection, and take the measurements.

  3. 03

    You get a written quotation with the GST and the subsidy. No charge, no pressure.

Rather talk now? +91 96010 96566

  1. Roof
  2. Place
  3. You

Where is the roof?

The PIN tells us which partner serves your district.