PM Surya Ghar: Muft Bijli Yojana
Up to ₹78,000 back, straight to your bank.

How much
₹30,000 a kW, then ₹18,000 for the third.
For a home: ₹30,000 for each of the first two kW and ₹18,000 for the third, so ₹78,000 for 3 kW or more.
₹30,000
₹60,000
₹78,000
₹78,000
₹78,000
- 1 kW
- 2 kW
- 3 kW
- 4 kW
- 5 kW
Above 3 kW the subsidy stays at ₹78,000; the bigger system still saves more on the bill.
Who can get it
Most homes with their own roof.
Your own home
A house with a roof you own or have the right to use, and an electricity connection in the family’s name.
A first solar subsidy
The connection has not had a central solar subsidy before.
Made-in-India panels
DCR panels, installed by a vendor registered on the portal. Orina Grid partners install exactly this.
Housing societies too
₹18,000 a kW for the society’s common areas: lifts, lights, pumps.
How it reaches you
Five stops. Your partner handles each.
- 01
Apply on the portal
Your partner registers your connection on pmsuryaghar.gov.in with your consumer number and mobile.
- 02
Feasibility
Your electricity company checks the connection and approves the solar size.
- 03
Installation
Your partner installs the system with DCR panels and uploads the details.
- 04
Net meter and inspection
The electricity company fits the net meter and inspects the system.
- 05
Subsidy to your bank
After the commissioning report, the subsidy is credited to the bank account you gave.
What you save
Move or type the bill. See the system, the subsidy and what you pay.
Worked out the way an Orina Grid partner quotes: 120 units a month from each kW, about ₹7 a unit, and the PM Surya Ghar subsidy for homes. Your partner's survey gives the final price.
- System size
- 3 kW
- It makes
- 360 units a month
- Price incl. GST
- ₹1.5–1.8 L
- PM Surya Ghar subsidy
- − ₹78,000
You pay, after the subsidy
₹0.72–1.02 L
Saved every month
₹2,500
Pays for itself in
about 3.4 years
Over 25 years that is about ₹6.48 L more than the system costs.
Get the exact quote, freeFAQ
Subsidy questions
Do I pay the full price first?
Yes. You pay your partner the price in the quotation, and the government credits the subsidy to your bank account after the system is inspected. Your quotation shows both: the full price, and what it comes to after the subsidy.
How long does the subsidy take?
It is released after the net meter is fitted and the system is inspected, usually a few weeks after installation. It depends on your electricity company and the portal.
Can I get a loan?
Banks offer solar loans under the scheme. Your partner can help you apply; the rate and the approval are the bank’s.
Is a bigger system worth it if the subsidy stops at 3 kW?
If your bill is high, yes: every extra kW makes about 120 more units a month. The calculator above shows what you save for your bill.
Free site survey
Start with a visit, not a sales pitch.
- 01
The Orina Grid partner for your PIN calls you, usually within a working day.
- 02
They visit, check the roof and the connection, and take the measurements.
- 03
You get a written quotation with the GST and the subsidy. No charge, no pressure.
Rather talk now? +91 96010 96566