Skip to content

How it works

Five steps, one partner, nothing left to you.

You tell us where the roof is. The Orina Grid partner for your district does the rest: survey, quotation, installation, the net meter and the subsidy paperwork.
Two installers fixing a solar panel onto its frame on a flat roof
  1. Day 0

    Step 01

    Tell us your PIN and bill

    Two minutes, here or on WhatsApp. Your PIN code tells us which Orina Grid partner serves your district.

    You
    Fill the form or send a WhatsApp: name, mobile, PIN code, and the bill if you know it.
    Your partner
    Calls you back, usually within a working day, and fixes a time to visit.
    You get
    A call from your district’s partner
  2. Usually day 1–3

    Step 02

    Free site survey

    The partner visits: the roof’s shade, strength and direction, and your electricity connection.

    You
    Show the roof and a recent electricity bill. Ask anything.
    Your partner
    Measures the shade-free area, checks the roof and the meter, and works out the size.
    You get
    The right size for your roof and bill
  3. Usually day 2–4

    Step 03

    A quotation you can read

    System, brands, GST and the PM Surya Ghar subsidy, line by line, as a PDF you can keep.

    You
    Read it, compare it, ask about the brands. Take your time.
    Your partner
    Sends the quotation as a PDF: material and work, HSN codes, GST, the subsidy and the net price.
    You get
    One price, with what you pay after the subsidy
  4. Usually week 1–3

    Step 04

    Installation and testing

    Structure, panels, inverter, wiring and earthing, by the partner’s own team, usually in a day or two.

    You
    Pay as the quotation says and keep the roof clear on the day.
    Your partner
    Fits the structure, panels and inverter, runs the wiring and earthing, tests it and shows you the app.
    You get
    A working system, tested and switched on
  5. Usually week 3–8

    Step 05

    Net meter and subsidy

    The partner files with your electricity company and on the national portal. The subsidy goes to your bank.

    You
    Sign where needed and share your bank details for the subsidy.
    Your partner
    Applies for the net meter with your electricity company and files the subsidy on the national portal.
    You get
    A net meter, and the subsidy in your account

What you get

Everything that goes on your roof.

Your quotation names the brand and the size of each part, so you know exactly what you are paying for.

Close view of monocrystalline solar panels in the sun
Made-in-India DCR panels
A wall-mounted solar inverter in a home
An inverter with an app
  • Solar panels

    Made-in-India DCR panels, which the PM Surya Ghar subsidy asks for. They turn sunlight into DC power.

  • Inverter

    Turns the panels’ DC into the AC your home uses, and shows the day’s units on your phone.

  • Mounting structure

    Galvanised steel, fixed to your RCC roof or tin shed and angled to the sun, built for the wind on your roof.

  • Net meter

    Fitted by your electricity company. It counts both ways, so units you do not use go to the grid and come off your bill.

  • Wiring and protection

    Solar cables, DC and AC boxes with fuses and breakers, so a fault switches off safely.

  • Earthing and lightning arrester

    Earth pits and an arrester on the roof, to keep the system and the people in the house safe.

Papers

Keep these ready. That is all you do.

Your partner fills the forms with your electricity company and on the PM Surya Ghar portal, and tells you if anything else is needed for your connection.

  • A recent electricity bill (it has your consumer number)
  • Aadhaar card of the person the connection is in the name of
  • Bank passbook or a cancelled cheque, for the subsidy
  • Proof the roof is yours: a property tax bill or the sale deed
  • A mobile number and an email for the national portal

FAQ

Before you start

Is my roof right for solar?

Most flat RCC roofs and tin sheds are. You need a shade-free area of about 100 square feet for each kW, facing the sun for most of the day. The free survey checks this before any price.

What happens in a power cut?

A grid-connected system switches itself off when the grid goes down, so no power flows to lines being repaired. If you want power during cuts, ask your partner about a battery.

How long does it take?

The survey within a few days, installation usually in the first three weeks, and the net meter and subsidy over the following weeks, depending on your electricity company.

Does it need much care?

Wash the dust off the panels every few weeks and keep the area around them clear. Your partner is in your district for service when you need it.

Free site survey

Start with a visit, not a sales pitch.

  1. 01

    The Orina Grid partner for your PIN calls you, usually within a working day.

  2. 02

    They visit, check the roof and the connection, and take the measurements.

  3. 03

    You get a written quotation with the GST and the subsidy. No charge, no pressure.

Rather talk now? +91 96010 96566

  1. Roof
  2. Place
  3. You

Where is the roof?

The PIN tells us which partner serves your district.